Observations

Restoration of 800 MW DEWA Phase III Project

EHS Observation Intelligence Dashboard

Live management oversight of observations, corrective actions, ageing and closure performance.

Total Observations1403Filtered population
Open0Avg age 0 days
Overdue00% of open
Closure Rate100%Avg close 0 days
High / Critical117Priority exposure
Management oversightNo overdue actions in current view
Open workload0 active items
Closure performance100% closed

Open Ageing

No data

Top Categories

Unsafe Condition
1165
Unsafe Act
146
Positive Observation
91
Near Miss
1

Severity Profile

Low
1087
Medium
199
High
117

Location Hotspots

PHASE C
854
PHASE B
361
TSF
73
SCRAPYARD
72
LAYDOWN
43

Recurring Sub-Categories

Welfare
206
Material Storage
123
Housekeeping
114
Waste Management
101
PPE
83
Barricading & Demarcation
82
Plant & Equipment
73
Traffic Management
46

Observations by Reporter

VALENTINE
135
VIJESH
133
CELESTINE
115
BETRIND
110
SIMON
105
JOHN PAUL
98
ASAD
97
SAJEEV
95

Monthly Observation Trend

Reported vs currently closed
2025-12774 / 774
2026-01626 / 626
ReportedClosed
0 = no age limit

Observation Register

1,403 matching records · click any column heading to sort

Sorted by Date Reported DESC
20882026-01-28ASADPHASE C11Unsafe ConditionMaterial StorageInappropriate cable-drum stoppers/chocks were being used, creating a risk of uncontrolled drum movement. Workers were also sitting close to the cable drum without adequate PPE.Low2026-01-282026-01-28Workers were moved away from the hazard area, appropriate controls were reinforced and safety awareness/verbal warning was provided.Closed
20872026-01-28AFTHABULLHPHASE C11Unsafe ConditionVehicle SafetyRear-view cameras on Excavators Nos. 97326 and 26925 were not functioning, reducing operator visibility during reversing and equipment movement.Medium2026-01-282026-01-28The defective camera systems were repaired/replaced and functionality was restored.Closed
20862026-01-28ASADPHASE C11Unsafe ConditionBarricading & DemarcationThe trench area was not adequately barricaded and equipment movement/access around the area was improperly controlled.Low2026-01-282026-01-28Suitable barricading and demarcation were provided around the trench area.Closed
20852026-01-28ASADPHASE C11Unsafe ConditionWaste ManagementWaste was scattered around the worksite because a suitable waste bin was not available.Low2026-01-282026-01-28A suitable waste bin was provided and the scattered waste was collected and removed.Closed
20842026-01-28ASADPHASE C11Unsafe ConditionEquipment CertificationThe required TPC for the insulation-resistance tester was not attached to/available with the applicable Permit to Work.Low2026-01-282026-01-28The required TPC was provided and attached/verified with the permit documentation.Closed
20832026-01-28SIMONPHASE C23Unsafe ConditionWelfareAccess steps to the toilet facility were unstable due to loose clamps and movement/shaking of the steps, creating a fall hazard.Low2026-01-282026-01-29The access steps and clamps were repaired and securely fixed.Closed
20822026-01-28SAJEEVPHASE B6Unsafe ConditionMaterial StorageUnsecured panels were observed at multiple locations without adequate restraint, creating a risk of movement, toppling or damage.Low2026-01-282026-01-28The panels were properly positioned and secured using suitable restraints.Closed
20812026-01-28SIMONPHASE C23Unsafe ConditionWaste ManagementWaste and damaged pallets were accumulated within the block and required removal.Low2026-01-282026-01-28The waste and damaged pallets were removed and properly disposed of.Closed
20802026-01-28VALENTINEPHASE C59Unsafe ConditionEnvironmental ControlEquipment No. 33862 was found with excessive hydraulic-oil leakage, creating equipment-safety and environmental contamination risks.Medium2026-01-282026-01-28The hydraulic leakage was rectified and the equipment was made serviceable.Closed
20792026-01-28KUMRESHTSFUnsafe ConditionHousekeepingThe dining hall was inadequately cleaned and required improved housekeeping and waste-management controls.Low2026-01-282026-01-28The dining hall was properly cleaned and housekeeping was completed.Closed
20782026-01-28SANTHOSHPHASE C81Unsafe ConditionPlant & EquipmentThe battery on Excavator No. 36125 was loose and not adequately secured, creating electrical and equipment-safety hazards.Low2026-01-282026-01-28The battery was correctly positioned and securely fixed.Closed
20772026-01-28SANTHOSHPHASE C81Unsafe ConditionVehicle SafetyExcavator No. 6009 was found without the required PWAS installed.Low2026-01-282026-01-28The P&M team was informed and the required PWAS was installed/arranged.Closed
20762026-01-28VIJESHPHASE B2Unsafe ConditionTools & MachineryHand tools in use were found in poor/unserviceable condition and were unsuitable for continued safe use.Low2026-01-282026-01-28The defective tools were replaced with serviceable hand tools.Closed
20752026-01-28SOHAILPHASE B6Unsafe ConditionPlant & EquipmentA JCB operating in Phase B had difficulty opening its engine bonnet and its battery terminals were found dirty/poorly maintained.Low2026-01-282026-01-30The bonnet and battery-maintenance deficiencies were rectified.Closed
20742026-01-28SANTHOSHPHASE C81Unsafe ConditionFire PreventionWeb slings and combustible materials were stored inside the battery compartment of Excavator No. 85013, increasing the risk of fire and electrical damage.Low2026-01-282026-01-28The stored materials were removed and the battery compartment was cleared.Closed
20732026-01-28ISRARELPHASE C11Unsafe ConditionChemical SafetySpray-painting work was being carried out without appropriate task-specific PPE. Paint materials were also improperly stored and the applicable SDS was not available/attached.Low2026-01-282026-01-28Required PPE was provided and the chemical-safety deficiencies were addressed.Closed
20722026-01-28ARUNPHASE C11Unsafe ConditionFire PreventionCombustible and unnecessary materials were found inside the operator cabin of Equipment No. 63745, increasing the potential fire load.Low2026-01-282026-01-28The combustible/unnecessary materials were removed and the cabin was cleaned.Closed
20712026-01-28SANTHOSHPHASE C81Unsafe ConditionWelfareRequired welfare facilities were not available to workers at the worksite during working hours.Low2026-01-282026-01-28Suitable welfare facilities were provided.Closed
20702026-01-28MICHAELPHASE C11Unsafe ConditionMaterial StorageMaterials were not stored in a safe and orderly manner, creating potential instability and access/housekeeping hazards.Low2026-01-282026-01-28The materials were properly arranged and safely stored.Closed
20692026-01-27VIJESHPHASE C3Unsafe ConditionWaste ManagementConcrete waste was accumulated within the worksite and required removal.Low2026-01-272026-01-29The concrete waste was collected, removed and properly disposed of.Closed
20682026-01-27DEVARAJLAYDOWNUnsafe ConditionBarricading & DemarcationWater barriers had fallen onto the ground and were not effectively maintaining the required demarcation.Low2026-01-272026-01-27The barriers were reinstated/removed as required and effective barricading was restored.Closed
20672026-01-27VIKASPHASE C42Unsafe ConditionWaste ManagementWaste had accumulated within the block and a suitable designated waste bin was not available.Low2026-01-272026-01-27The accumulated waste was removed and properly disposed of.Closed
20662026-01-27CALISTUSSCRAPYARDUnsafe ConditionExcavationAn excavation/work area was not adequately barricaded or identified, creating slip, trip and fall hazards.Low2026-01-272026-01-27Suitable barricading was installed around the affected area.Closed
20652026-01-27SANTHOSHPHASE C81Unsafe ConditionDismantling ActivitiesDuring track-removal activity, substandard/improvised materials were being used as supports instead of purpose-designed jacks, creating instability and crush hazards.Low2026-01-272026-01-27Suitable jacks were provided and the dismantling activity was completed using the correct support arrangement.Closed
20642026-01-27DEVARAJLAYDOWNUnsafe ConditionHousekeepingMaterials were scattered around the post-storage area, creating obstruction and poor housekeeping conditions.Low2026-01-272026-01-27The scattered materials were properly arranged and housekeeping was completed.Closed
Page 1 of 57